What kind of inspections are required?

New Construction

  • Footing (before concrete is poured)
  • Anchor Bolts / Drain Tile
  • Slab
  • Framing - Rough In
  • Electric - Rough In
  • Plumbing - Rough In
  • Mechanical - Rough In
  • Insulation
  • Meter Base
  • Final Rough In inspections are preferred to be done at the same time.

Modular

  • Footing (before concrete is poured)
  • Foundation / Sill Plate (before setting the home)
  • Plumbing
  • Electric / Meter Base
  • Final

Manufactured / on Frame Modular

  • Footing
  • Block / Anchor / Strap - also known as "setup"
  • Plumbing
  • Meter Base
  • Final

Note: Additional inspections may be required depending on your construction project.

Show All Answers

1. What applications are required?
2. What works requires a permit?
3. When do I not need a permit?
4. Can I do the work myself?
5. How much will my permit cost?
6. Will my permit expire?
7. What does farm use mean?
8. How do I get an address for my property?
9. Who is my power company?
10. How do I get an inspection?
11. What kind of inspections are required?